Projects
From first survey to energisation.
A selection of rail electrification, high-voltage distribution and civils programmes across the UK, some delivered and some on site now. Full case studies and detailed references are available on PQQ or tender request.
- Disciplines
- Rail, HV, Civils
- Settings
- Mainline, metro, depot
- Midlands, North, South, Scotland
- 4 regions
01Selected work
Delivered and on site.
6 projects

A new portal gantry and its wiring across a four-track main line, with plant still on the track. Rail Midlands
DeliveredMidland Main Line, Kettering to Wigston: energised on programme.
RC Infrastructure delivered overhead line equipment design, install, test and commission across the Kettering to Wigston section of the MML electrification programme.
Network Rail (via tier-one alliance)

Steelwork, busbars and porcelain insulators in an outdoor high-voltage compound. Power & HV North
DeliveredFeeder station upgrade programme.
Design and install works to upgrade protection and control on feeder stations supporting mainline AC electrification. Energised without service disruption.
Tier-one alliance

A civils crew rebuilds the track bed between sheet piles, under the wires. Rail South
On siteMetro depot electrification.
Full OLE, HV and enabling civils package for a new metro depot. Piling through to commissioning, delivered as one programme.
Metro operator

Enabling works beside an electrified main line: a construction compound and new structures laid out around the railway. Civils Scotland
On siteScotland electrification: enabling civils.
Piled foundations, access roads and troughing on a major Scottish electrification route. Sequenced to the wiring programme and handed over on each possession boundary.
Network Rail Scotland (via prime)

A substation compound and transmission towers, seen across the battery containers of an energy storage site. Power & HV North
DeliveredRenewable generation grid connection.
Pre-application route review, detailed design, build and commissioning for a 132 kV import and export grid connection supporting a generation scheme.
Renewables developer

A piling rig and crane place a reinforcement cage for a bored foundation. Civils Midlands
DeliveredHigh-speed rail enabling works package.
Civils, groundworks and access-road package supporting a major HS2 site. Coordinated with multiple principal contractors operating in parallel.
HS2 tier-one contractor
02On programme, in possession
Handed back, ready for service.
Every scheme in the selection above is self-delivered by one team against one schedule. Targeted case study packs are available within one working day.
- Case study turnaround
- 1 working day
- Accreditation pack
- PQQ-ready
- Framework experience
- Tier-one
Accredited
- RISQS
- Link-up
- ISO 9001
- ISO 14001
- ISO 45001
- Constructionline
- CHAS
- Achilles UVDB
Next step
Looking for specific project references? Tell us what you need to see.
We will issue a targeted case study pack within one working day.