Capability 01 / Rail electrification
From first survey to first service.
We design, install, test and commission overhead line equipment for mainline, metro and private rail networks across the UK. In possession, on programme, handed back ready for service.
- Design stages
- GRIP 1 to 4
- Mainline voltage
- 25 kV AC
- Catenary systems
- Series 1, 2, Mk3B
01What we deliver
Self-delivered, end to end.
No stitched-together supply chain. No accountability gaps at discipline boundaries.
- 01GRIP 1 to 4 design and detailed design
- 02Catenary systems: Series 1, Series 2, Mk3B and bespoke
- 03Masts, portals, small part steelwork, registration and wiring
- 04Isolation and possession support
- 05Testing and commissioning to Network Rail and ENA standards
- 06Entry into service and defect close-out
- 07Post-handover maintenance for private networks
- 08Interface with signalling, permanent way and civils

02Four phases, one schedule
Design. Install. Test. Maintain.
Every electrification scheme we take on is broken into four phases, delivered by one team on one Gantt.
- Client-accepted
- Network Rail
- RIDDOR, rolling 365 days
- 0
- Longest package
- 4 years
01Design
Interface clashes are resolved on paper, not on the rail head.
Our in-house designers work from GRIP 1 through to AFC issue. We interface early with signalling, telecoms, permanent way and civils, so that clashes are found on the drawing and not during a possession.

Fig. 3.2Drawings checked against newly laid switches and crossings: the permanent way interface an overhead line design has to agree with. 02Install
Led by engineers who came up through the corridor.
Self-delivered crews plan possessions to the hour and sequence civils and OLE on one Gantt. Contingency is built in, so that trains still run at 04:58 even when the weather does not cooperate.

Fig. 3.3Linesmen work at a new gantry from a road-rail access platform during a possession. 03Test and commission
Audit-ready on the first submission.
Our test engineers run site acceptance to a standard that clears Network Rail or infrastructure manager audit on the first pass. Commissioning packs are issued ready for entry into service, without chase cycles.

Fig. 3.4Foundations, masts, cantilevers and wires: the finished sequence on a two-track main line. 04Maintain
Long-term asset stewardship for private networks.
For private networks and depot electrification, we provide planned maintenance, fault response and long-term asset stewardship. Same engineers, extended relationship.

Fig. 3.5Walking the line under the wires.
03Typical scheme
The shape of a rail scheme we would take on.
- Route length
- 2 km to 80 km per delivery package
- Duration
- 6 months to 4 years
- Team size
- 8 to 60, depending on possession window
- Value band
- £1m to £40m+ per package
- Voltage
- 25 kV AC on the main line, DC on metro and light rail
- Settings
- Mainline, metro, light rail, depots and sidings
04Rail projects
Where this capability has been put to work.
Rail Midlands
DeliveredMidland Main Line, Kettering to Wigston: energised on programme.
RC Infrastructure delivered overhead line equipment design, install, test and commission across the Kettering to Wigston section of the MML electrification programme.
Network Rail (via tier-one alliance)
Rail South
On siteMetro depot electrification.
Full OLE, HV and enabling civils package for a new metro depot. Piling through to commissioning, delivered as one programme.
Metro operator
Accredited
- RISQS
- Link-up
- ISO 9001
- ISO 14001
- ISO 45001
- Constructionline
- CHAS
- Achilles UVDB
Next step
Starting an electrification scheme? Bring us in early.
Framework enquiries, scope reviews, design-assist and PQQ support. First response within one working day.