RC Infrastructure

Capability 02 / Power distribution and HV

Engineered to energise on time.

From 11 kV distribution to 132 kV feeders, autotransformer sites and DNO grid connections. The hidden infrastructure that decides whether a scheme lights up on programme.

132 kV GRID SUPPLYDisconnectorCircuit breakerPProtectionGrid transformer132 / 33 kV33 kV SWITCHBOARD33 / 11 kV11 kV DISTRIBUTIONMMeteringGGenerationand storage33 kV / LVAuxiliary supplies
HV connection: single-line diagramRCI-04-AIndicative arrangement. Not to scale. Drag sideways to pan.
Voltage band
11 to 132 kV
Sectors
DNO, rail, BESS
Standards we test to
ENA and Network Rail

01What we deliver

From feasibility to energisation.

The hidden infrastructure that gets schemes through DNO approval, installation and test on programme.

  1. 01LV, 11 kV, 33 kV, 66 kV and 132 kV distribution
  2. 02Substations and switch rooms
  3. 03Feeder stations and autotransformer sites
  4. 04DNO grid connections (import and export)
  5. 05Protection, control and SCADA
  6. 06Cable installation: ducted, direct buried and in-trough
  7. 07Testing and commissioning to ENA and Network Rail requirements, including G99 and G5/5
  8. 08Operational maintenance for private HV networks

02Four phases, one schedule

Feasibility. Design. Build. Commission.

Route selection and DNO liaison are where most HV delays are won or lost. We engage before the connection application is filed, then carry design, build and commissioning through one accountable team.

Maximum voltage
132 kV
Generation connections
G99
From pre-application
DNO liaison
Integration
SCADA
  1. 01Feasibility and grid strategy

    Route selection is where most HV delays are won or lost.

    We work with clients before a connection application has even been made. Route selection, point-of-connection optioneering and DNO liaison set the trajectory of the whole programme. We start here.

    Aerial view of a battery energy storage site: rows of green battery containers, a fenced substation compound and transmission towers beyond.
    Fig. 4.1A battery storage site, its substation compound and transmission towers beyond: the three things a point-of-connection study has to reconcile.
  2. 02Design

    Design for buildability, commissioning and audit.

    Load studies, protection grading, earthing and bonding, and full detailed design to ENA standards. Our installers will build what we draw. Our commissioning engineers will commission what they install.

    Current, log scaleOperating time, log scale123Grading marginNearest device operates first1Feeder relay2Transformer relay3Incomer relay
    Protection grading: time and currentRCI-04-BIndicative curves. Not to scale. Drag sideways to pan.
  3. 03Build

    Own plant, own crews, own logistics.

    Self-delivered civils, cabling, switchgear installation and substation fit-out. Cable pulling through rail troughing, direct burial across rural corridors and ducted installation in urban sites. We run our own cable pulling equipment.

    Looking up at the steel gantries, busbars and brown porcelain insulators of an outdoor high-voltage substation against a blue sky.
    Fig. 4.2Steelwork, busbars and porcelain insulators in an outdoor high-voltage compound.
  4. 04Test, commission and maintain

    Audit-ready packs. Long-term relationships.

    Factory acceptance, site acceptance, point-on-wave commissioning, protection testing and SCADA integration. Then planned maintenance, fault response and emergency call-out for private HV networks.

    The upper half of a distribution transformer with labelled terminals and yellow lifting lugs, in a factory with other transformers out of focus behind.
    Fig. 4.3In the factory: a distribution transformer, with other units behind it. Factory acceptance happens here, before anything ships.
    A grey ground-mounted distribution transformer with high-voltage bushings and cable terminations, installed beside a brick wall and a palisade fence.
    Fig. 4.4On site: a ground-mounted distribution transformer, installed and cabled up.

03Typical scheme

The shape of an HV programme we would take on.

Voltage band
11 kV to 132 kV
Scope
Greenfield feeders, brownfield upgrades, grid connections
Duration
6 months to 3 years
Value band
£500k to £30m+
Sectors
Rail, DNO, renewables, data centres, industrial

Accredited

  • RISQS
  • Link-up
  • ISO 9001
  • ISO 14001
  • ISO 45001
  • Constructionline
  • CHAS
  • Achilles UVDB

Next step

Planning a grid connection or HV upgrade? Talk to us before you apply.

Pre-application route reviews, DNO liaison, PQQ and framework support. First response within one working day.