Case study / Civils
High-speed rail enabling works package.
Civils, groundworks and access-road package supporting a major HS2 site. Coordinated with multiple principal contractors operating in parallel.

- Value band
- £6m
- Duration
- 12 months
- Status
- Delivered
01Summary
Client, value and status at a glance.
- Client
- HS2 tier-one contractor
- Capability
- Civils
- Region
- Midlands
- Value band
- £6m
- Duration
- 12 months
- Status
- Delivered
02The work
What it took, and how it ended.
The challenge
One site, several principal contractors.
The package had to be delivered alongside multiple principal contractors working in parallel, each with a programme and access needs of their own.
What we delivered
Civils, groundworks and access roads.
Groundworks, enabling civils and site access roads, planned and coordinated around the other contractors on site.
Outcome
Completed and handed over.
The package was completed and handed over, coordinated throughout with the principal contractors working alongside us.
03More projects
Other work in the set.

Civils Scotland
On siteScotland electrification: enabling civils.
Piled foundations, access roads and troughing on a major Scottish electrification route. Sequenced to the wiring programme and handed over on each possession boundary.
Network Rail Scotland (via prime)

Rail Midlands
DeliveredMidland Main Line, Kettering to Wigston: energised on programme.
RC Infrastructure delivered overhead line equipment design, install, test and commission across the Kettering to Wigston section of the MML electrification programme.
Network Rail (via tier-one alliance)
Next step
Delivering a similar scheme? Talk to the team behind this one.
References and full project documentation are available on PQQ or tender request.