Case study / Power & HV
Feeder station upgrade programme.
Design and install works to upgrade protection and control on feeder stations supporting mainline AC electrification. Energised without service disruption.

- Value band
- £8m
- Duration
- 18 months
- Status
- Delivered
01Summary
Client, value and status at a glance.
- Client
- Tier-one alliance
- Capability
- Power & HV
- Region
- North
- Value band
- £8m
- Duration
- 18 months
- Status
- Delivered
02The work
What it took, and how it ended.
The challenge
Upgrading the supply the railway was still using.
Protection and control had to be replaced on feeder stations that support mainline AC electrification, so each changeover was planned around the traction supply the railway needed.
What we delivered
Protection and control, designed and installed in-house.
Detailed design, installation, testing and commissioning of the upgraded protection and control systems across the programme.
Outcome
Energised without service disruption.
The upgraded feeder stations were energised without disruption to passenger services.
03More projects
Other work in the set.

Power & HV North
DeliveredRenewable generation grid connection.
Pre-application route review, detailed design, build and commissioning for a 132 kV import and export grid connection supporting a generation scheme.
Renewables developer

Rail South
On siteMetro depot electrification.
Full OLE, HV and enabling civils package for a new metro depot. Piling through to commissioning, delivered as one programme.
Metro operator
Next step
Delivering a similar scheme? Talk to the team behind this one.
References and full project documentation are available on PQQ or tender request.