Case study / Civils
Scotland electrification: enabling civils.
Piled foundations, access roads and troughing on a major Scottish electrification route. Sequenced to the wiring programme and handed over on each possession boundary.

- Value band
- £14m
- Duration
- 2.5 years
- Status
- On site
01Summary
Client, value and status at a glance.
- Client
- Network Rail Scotland (via prime)
- Capability
- Civils
- Region
- Scotland
- Value band
- £14m
- Duration
- 2.5 years
- Status
- On site
02The work
What it took, and where it stands.
The challenge
Civils that set the pace for the wiring behind them.
On an electrification route, every foundation, access point and troughing run has to be ready before the wiring teams arrive. A late handover costs a possession.
What we are delivering
Foundations, access and troughing, sequenced to the wiring.
Piled foundations for the overhead line structures, access roads and cable troughing routes, planned against the wiring programme and handed over at each possession boundary.
Where it stands
On site now.
Works are in progress, with completed sections handed to the wiring programme as each possession closes.
03More projects
Other work in the set.

Civils Midlands
DeliveredHigh-speed rail enabling works package.
Civils, groundworks and access-road package supporting a major HS2 site. Coordinated with multiple principal contractors operating in parallel.
HS2 tier-one contractor

Power & HV North
DeliveredRenewable generation grid connection.
Pre-application route review, detailed design, build and commissioning for a 132 kV import and export grid connection supporting a generation scheme.
Renewables developer
Next step
Delivering a similar scheme? Talk to the team behind this one.
References and full project documentation are available on PQQ or tender request.