Civils that let the wiring team start on day one.

Piled foundations, access roads, troughing routes and enabling works. Self-delivered and sequenced to the electrification schedule, so OLE and HV teams arrive to a site that is ready to build on.

Pile lengthRail levelMastCable trough routeCessBallastPiled foundationPile toeMade groundFirm clayDense sand and gravel
Mast foundation: sectionRCI-05-AIndicative arrangement. Not to scale. Drag sideways to pan.
ECI entry point
GRIP 2
Rail-mounted rigs
Piled foundations
Own plant and crews
Self-delivered

01What we deliver

Every enabling task, sequenced to the programme.

  1. 01Piled foundations for OLE masts and portals
  2. 02Reinforced concrete foundations for feeder stations
  3. 03Access roads and RRAP pads
  4. 04Cable troughing routes (concrete and GRP)
  5. 05Drainage, fencing and security
  6. 06Compound set-up, welfare and site infrastructure
  7. 07Permanent way interface works
  8. 08Demolition and site clearance
  9. 09Environmental mitigation and ecology management
A civils crew and an excavator laying a new track bed between sheet-piled walls, beneath an overhead line gantry and its wires.
Fig. 5.1A civils crew rebuilds the track bed between sheet piles, under the wires.

02Why self-deliver

Civils failures are the leading cause of OLE slippage.

A foundation that fails its test. An access road that washes out. A troughing run that arrives three weeks late. Each can cost a possession, and possessions cannot be recovered.

We self-deliver civils so the schedule has one owner, the risk register has one format, and the commissioning engineer does not arrive to find a foundation that is not their problem to solve.

Foundation standard
Tested
Piling rigs and plant
In-house
To OLE and HV
Sequenced
Design philosophy
Possession-aware
  1. 01Early contractor involvement

    The possession risk of the whole scheme is set at GRIP 2.

    Where clients allow it, we engage at GRIP 2 to influence foundation strategy and access planning. The decisions made at this stage set the possession risk for the whole scheme.

    Aerial view of a construction compound, haul road and new bridge abutments beside a two-track electrified railway running through farmland.
    Fig. 5.2Access planning seen from above: a compound, a haul road and new structures set out beside an electrified railway.
  2. 02Ground investigation and design

    Foundations designed for the possession window that will install them.

    In-house geotechnical interpretation and foundation design. We design foundations that can be installed inside the possession windows the OLE programme assumes.

    TestsDEPTH (m)Description024681012Water strikeMade groundFirm clayDense sand and gravelWeathered mudstoneDesign toe level
    Ground investigation: borehole logRCI-05-BIndicative strata. Not to scale. Drag sideways to pan.
  3. 03Install

    Own plant. Own crews. Known location next Tuesday.

    Our own piling rigs, excavators, concrete pumps and rail-mounted plant. Self-delivered means we know where the rig will be next Tuesday, because it is ours.

    A piling rig and a crane lowering a steel reinforcement cage beside a group of workers in orange hi-vis, with an excavator and a second yellow machine in the foreground of a foundation site in open countryside.
    Fig. 5.3A piling rig and crane place a reinforcement cage for a bored foundation.
  4. 04Interface

    Foundation complete, mast erected, wire up: one sequence.

    Civils sits upstream of OLE and HV. We plan the handover from foundation complete, to mast erected, to wire up as one sequence, not three.

    A two-track electrified railway seen from an overbridge, with new galvanised masts and cantilevers carrying the overhead wires into the distance.
    Fig. 5.4Foundations, masts, cantilevers and wires: the finished sequence on a two-track main line.

03Typical scheme

The shape of a civils scope we would take on.

Duration
3 months to 3 years
Team size
4 to 30 per crew
Value band
£250k to £20m+
Settings
Mainline rail, metro, depot and HV substation sites
Scope
Enabling works, foundations, access and troughing

Accredited

  • RISQS
  • Link-up
  • ISO 9001
  • ISO 14001
  • ISO 45001
  • Constructionline
  • CHAS
  • Achilles UVDB

Next step

Need enabling civils that match the electrification programme? Start with a scope review.

Scope reviews, ECI proposals and PQQ support. First response within one working day.