Case study / Power & HV
Renewable generation grid connection.
Pre-application route review, detailed design, build and commissioning for a 132 kV import and export grid connection supporting a generation scheme.

- Value band
- £9m
- Duration
- 14 months
- Status
- Delivered
01Summary
Client, value and status at a glance.
- Client
- Renewables developer
- Capability
- Power & HV
- Region
- North
- Value band
- £9m
- Duration
- 14 months
- Status
- Delivered
02The work
What it took, and how it ended.
The challenge
A connection that had to satisfy the network operator before it could energise.
A 132 kV import and export connection depends on the route, the point of connection and the network operator’s requirements being settled early. Each of them can move the energisation date.
What we delivered
From route review to commissioning.
Pre-application route review, detailed design, construction and commissioning of the 132 kV connection, with network operator liaison handled by the same team throughout.
Outcome
Built and commissioned as one package.
The connection was designed, built and commissioned by one team, from the first route review through to energisation.
03More projects
Other work in the set.

Power & HV North
DeliveredFeeder station upgrade programme.
Design and install works to upgrade protection and control on feeder stations supporting mainline AC electrification. Energised without service disruption.
Tier-one alliance

Civils Midlands
DeliveredHigh-speed rail enabling works package.
Civils, groundworks and access-road package supporting a major HS2 site. Coordinated with multiple principal contractors operating in parallel.
HS2 tier-one contractor
Next step
Delivering a similar scheme? Talk to the team behind this one.
References and full project documentation are available on PQQ or tender request.