Capabilities
Three disciplines, one accountable programme.
Overhead line equipment, high-voltage distribution and enabling civils. We plan them as one schedule, resource them from one team, and commission them against one signature.
- Three disciplines
- Rail, HV, Civils
- On the commissioning pack
- One signature
- End to end
- Self-delivered
01Why self-delivery
One team. One schedule. One signature.
We built RC Infrastructure so that the three disciplines that sit next to each other on every electrification scheme could be delivered by one accountable team.
When OLE, HV and civils are sub-contracted across three organisations, programme risk multiplies. Possessions slip. Commissioning dates drag.
When they come from one company, the schedule has one owner, the risk register has one format, and the commissioning pack rolls up to one signature.
02The three
Rail. Power. Civils.
Each discipline has its own page, with scope, systems covered, sectors and scheme profile.

Overhead Line Equipment
Design, install, test and commission catenary systems for mainline and metro. Series 1, Series 2, Mk3B and bespoke arrangements.
Rail electrification
Power Distribution & HV
11 kV to 132 kV distribution, feeder stations, autotransformer sites and DNO grid connections for rail and national infrastructure clients.
Power and HV
Civils & Groundworks
Piled foundations, access roads, troughing routes and enabling works. All self-delivered, sequenced to the electrification programme.
Civils and groundworks03Lifecycle
Design. Install. Test and commission. Maintain.
Every scope follows the same four-phase commitment, regardless of discipline. Possessions are planned to the hour. Commissioning packs roll up to one signature.
Phase 01
Design
Feasibility, optioneering, GRIP 1 to 4 design, detailed design and interface management.
Phase 02
Install
Self-delivered crews, possessions planned to the hour, civils and wiring sequenced as one programme.
Phase 03
Test and commission
Factory acceptance, site acceptance, entry into service and audit-ready handover packs.
Phase 04
Maintain
Planned maintenance, fault response and asset stewardship for private networks.
- Design stages
- GRIP 1 to 4
- RIDDOR, rolling 365 days
- 0
- Client-approved
- Tier-one
Accredited
- RISQS
- Link-up
- ISO 9001
- ISO 14001
- ISO 45001
- Constructionline
- CHAS
- Achilles UVDB
Next step
Tell us about the scheme.
Framework enquiries, PQQ support, scope reviews. First response within one working day.
